Welcome to Geological Journal of China Universities ! Today is
Share:

Geological Journal of China Universities ›› 2024, Vol. 30 ›› Issue (01): 100-109.DOI: 10.16108/j.issn1006-7493.2022084

Previous Articles     Next Articles

Research on the Construction of Achievement Platform of Fine Reservoir Description of Oilfield Development

CHEN Huanqing1,CHEN Shunxin2   

  1. 1. Research Institute of Petroleum Exploration and Development, PetroChina, Beijing 100083, China;
    2. Xidian University, Xi’an 710126, China
  • Online:2024-02-18 Published:2024-02-18

Abstract: Fine reservoir description is one of the most basic works in oilfield development and has always been attached great importance to researchers. At present, the critical problems in fine reservoir description mainly include five aspects: poor inheritance of research results, non-standard storage of basic data, large gap of professional software demand, strengthening the application of the results and non-standard management of the results. Through the construction of fine reservoir description achievement platform, the above problems can be solved from the aspects of basic data preparation, professional software sharing, collaborative research, and standardized storage management of results standards. The fine reservoir description data management mainly includes the statistics and analysis of the overall data information of the project, the collation and statistics of the project research data, the docking of the achievement platform with other data platforms and the data call. The fine reservoir description collaborative research process mainly includes the platform implementation and use of professional software, the conversion and call of intermediate results between different professional software, and the automation implementation and completion of research work. The storage and management of fine reservoir description results mainly include the unified standard of format in result uploading management, quality control in result storage uploading, tracking and updating in r esult production application.

Key words: fine reservoir description, achievement management platform, the collaborative research, professional software;
standards and specifications,
quality control

CLC Number: