欢迎访问《高校地质学报》官方网站,今天是
分享到:

J4

• 文章目录 • 上一篇    下一篇

山东淄博市地下水资源评价及其合理开发利用研究

刘建立 朱学愚 陈余道   

  1. [1]南京大学地球科学系 [2]桂林工学院资源与环境工程系
  • 收稿日期:1999-06-20 修回日期:1999-06-20 出版日期:1999-06-20 发布日期:1999-06-20

NUMERICAL STUDY ON RATIONAL UTILIZATION OF GROUNDWATER RESOURCES IN ZIBO CITY, SHANDONG PROVINCE

LIU Jian-li1,ZHU Xue-yu1,CHEN Yu-dao2   

  1. 1.Department of Earth Sciences, Nanjing University, Nanjing, 210093; 2.Department of Resources and Environmental Engineering, Guilin Institute of Technology
  • Received:1999-06-20 Revised:1999-06-20 Online:1999-06-20 Published:1999-06-20

摘要: 本文采用有限单元法进行地下水资源评价以解决评价区供水面积大、精度要求高的矛盾。首先根据实际的开采量和长期观测孔的水位资料,校正数学模型,反求有关参数;然后给定开采方案进行未来水头的预测;最后研究地下水资源的合理开发利用问题。利用有限单元法进行水源地或单一含水层的地下水资源评价已被证明是先进的、有效的。本文是对水文地质条件非常复杂的大面积的区域,用有限单元法进行地下水资源评价的一种尝试,可供类似地区参考。

Abstract: Groundwater is the major water source of Zibo city and provides approximately 70% of total water supplies in this city.Therefore, the rational utilization and proper exploitation of groundwater resources is of essential importance for the sustainable development of the city. The research area, which covers 5 districts and 1 county, is located in the Zibo syncline basin and be longs to a single hydrogeological unit. In this research, the 6 administrative zones above-mentioned is simulated as a unity. Geological and hydrogeological conditions are quite complex in this area since major aquifers are of fracture-karst orientation with different media properties. Furthermore, many large-scale structural movements occurred in geological history also greatly influenced the characteristics of groundwater flow. In previous studies, water-balance method was often employed under such conditions. However, because some important factors can not be determined accurately, the results are not very convincible. Finite Element Method (FEM) is thus employed in this paper to resolve the contradiction between large computational effort and high precision demanding in groundwater resources evaluation of Zibo City. First, a simplified conceptual model maintaining key features of the research area is set up through careful study of numerous geological and hydrogeological data and relevant literatures. Then, with the well statistics of historical pumping and long-term groundwater level observations, a mathematical model based on the conceptual model is constructed and calibrated. In the meanwhile relevant model parameters are also obtained by solving the inverse problem through trial-and-error approach. After that, rectification procedures began with additional observational data. The results show that computations and observations match very well at most locations and that the numerical mod el can be used to forecast groundwater flow field in the future. The next step is to predict water head in the future using given pumping plans and other conditions, such as mod el boundary definition, precipitation series, etc. Finally, suggestions on rational development and utilization of groundwater resources in Zibo City are discussed based upon analysis of the model output.